📘TOEIC 700 Practice
TOEIC 700 · LESSON 15 OF 20

Manufacturing & Quality Control

TOEIC Skills Practiced: Listening Parts 3–4 · Reading Parts 5–7 | Grammar Focus: Participial Adjectives (-ing vs. -ed)

🎯 TOEIC 700 Level 📖 10 Key Words 📝 Parts 5–7 + Listening
⬇ Download Full Lesson (.docx)

🔥 Warm-Up (5 minutes)

  • Have you ever visited a factory or production line? What did you see?
  • Why is quality control important in manufacturing?

📖 Key Vocabulary

EnglishTypeExample Sentence
assembly linen.Workers on the assembly line inspect each product.
defectn.The inspector found a defect in the packaging.
inspectionn.Quality inspection takes place before shipment.
raw materialn.The factory imports raw materials from several countries.
outputn.Monthly output increased by 15% this year.
malfunctionn./v.The machine malfunctioned during the night shift.
efficiencyn.New equipment improved production efficiency.
specificationn.The parts must meet strict specifications.
durableadj.The new packaging is more durable than the old one.
recalln./v.The company issued a recall after the defect was discovered.

🧠 Grammar / Strategy Focus

📐

Participial adjectives ending in -ing describe something that causes a feeling or effect (“The malfunctioning machine caused a delay” — the machine causes the problem). Participial adjectives ending in -ed describe how someone feels or is affected (“The confused technician called for help” — the technician feels confused). A common TOEIC error is confusing the two forms: “The results were satisfying” (the results caused satisfaction) versus “The manager was satisfied” (the manager feels satisfaction).

✏️ Part 5 Practice

Incomplete Sentences

Question 1
The ______ machine on line 3 was shut down for repairs.
(A)malfunction
(B)malfunctioning
(C)malfunctioned
(D)malfunctions
Question 2
Workers were ______ by the sudden increase in defective units.
(A)concerning
(B)concern
(C)concerned
(D)concerns
Question 3
The inspection results were ______, showing a 40% drop in defects.
(A)encourage
(B)encouraging
(C)encouraged
(D)encouragement
Question 4
The ______ engineer quickly identified the cause of the delay.
(A)experience
(B)experiencing
(C)experienced
(D)experiences
Question 5
Managers were ______ with the factory's improved efficiency this quarter.
(A)satisfying
(B)satisfy
(C)satisfied
(D)satisfaction

📝 Part 6 Practice

Text Completion (Subject: Voluntary Product Recall — Model X200)

To: All Production Staff

From: Quality Control Department

Re: Voluntary Product Recall — Model X200

We have identified a (1) defect in a batch of Model X200 units produced between March 1 and March 15. The defect may cause the product to (2) after extended use. All (3) units must be pulled from the production line immediately and set aside for inspection. Staff who find affected units should report them to their supervisor without (4). We appreciate your cooperation in resolving this issue quickly.

Quality Control Department

Blank (1)
(A)concern
(B)concerning
(C)concerned
(D)concerns
Blank (2)
(A)malfunction
(B)malfunctioning
(C)malfunctioned
(D)malfunctions
Blank (3)
(A)affect
(B)affecting
(C)affected
(D)affects
Blank (4)
(A)delay
(B)delaying
(C)delayed
(D)delays

📰 Part 7 Practice

Reading Comprehension

A garment factory in Binh Duong Province has reported a 25% increase in production efficiency after upgrading its assembly line equipment last quarter. The new machines, which include automated stitching and quality-inspection systems, have reduced the average time needed to complete each unit from 12 minutes to 9 minutes.

According to the factory manager, the upgrade also led to a significant decrease in defects, from 3.2% to 1.1% of total output. The factory plans to invest in additional automated equipment next year and expects efficiency to improve further. Workers have received additional training to operate the new machines safely and effectively.

Question 1
What is the article mainly about?
(A)A new factory location
(B)An increase in worker salaries
(C)Improved efficiency after an equipment upgrade
(D)A decrease in raw material costs
Question 2
How much did the defect rate change?
(A)It increased slightly
(B)It decreased from 3.2% to 1.1%
(C)It stayed the same
(D)It was not measured
Question 3
What will the factory do next year?
(A)Reduce its workforce
(B)Move to a new location
(C)Invest in more automated equipment
(D)Stop producing garments
Question 4
The word “significant” in paragraph 2 is closest in meaning to
(A)small
(B)noticeable
(C)unexpected
(D)temporary

🎧 Listening Practice

Talk (Part 4 style)

Teacher: read the script aloud twice (or record it) at natural speed, then ask students the questions below.

Attention all staff. Please be advised that line 2 will be shut down for scheduled maintenance this afternoon from 1 to 3 p.m. During this time, workers assigned to line 2 should report to the training room for a session on the new quality-inspection system. Please bring your employee badge, as attendance will be recorded. Regular operations will resume at 3 p.m. Thank you for your cooperation.

Question 1
Why will line 2 be shut down?
(A)A malfunction occurred
(B)Scheduled maintenance
(C)A power outage
(D)A safety inspection
Question 2
What should line 2 workers do during the shutdown?
(A)Go home early
(B)Attend a training session
(C)Work on line 3 instead
(D)Take a lunch break
Question 3
What should workers bring to the training room?
(A)A notebook
(B)Safety equipment
(C)Their employee badge
(D)A completed form

🔑 Answer Key

Part 5
1. B 2. C 3. B 4. C 5. C
Part 6
1. B 2. A 3. C 4. A
Part 7
1. C 2. B 3. C 4. B
Listening
1. B 2. B 3. C

Want to teach this offline, print it, or adapt it for your class?

⬇ Download Full Lesson (.docx)